Detailed Design & Assurance

Produce coordinated, verified and construction ready information while protecting the approved project basis.

Objective

What this phase must achieve.

Translate the approved definition into complete engineering information that can be procured, constructed, tested and operated safely. Design decisions, interfaces, changes and verification evidence must remain visible and controlled.

Questions to resolve

What the client needs to know

  • Is every discipline working to the same approved basis and interface information?
  • Are calculations, drawings, models, specifications and vendor data complete and verified?
  • Can the design be safely constructed, commissioned, operated and maintained?
  • Are changes, concessions, actions and residual risks traceable?

Typical work

How the evidence is developed

  • Multidisciplinary detailed engineering and design coordination
  • Calculations, modelling, equipment specification and drawing production
  • Design reviews, checking, verification and technical assurance
  • Vendor document review and interface management
  • Constructability, maintainability and commissioning review
  • Quality planning, design change control and action closeout

Outputs

What should exist at the end.

The exact deliverables depend on the sector, asset, appointment and decision being supported. The output should always be proportionate, controlled and usable by the people responsible for the next decision.

  1. 01Approved calculations, drawings, models and specifications
  2. 02Equipment, instrument, cable, line and document schedules
  3. 03Verified vendor information and coordinated interfaces
  4. 04Design review, checking and assurance records
  5. 05Construction work packs and technical requisitions
  6. 06Controlled design baseline with residual risk information

Decision gate

The decision this phase supports.

Release defined packages for procurement and construction only when the design status, verification, interfaces and outstanding actions are understood. The gate may be progressive by system or work package.

How JCMCE can help

Engineering aligned to the decision.

JCMCE can provide individual disciplines, an integrated design team, design management, contractor oversight or independent assurance. The focus is practical engineering, buildable information and evidence that the design satisfies its requirements.